Commissioning

Intelli-Eng delivers comprehensive commissioning services designed to ensure that complex engineering systems are installed, tested, and operate exactly as intended. We provide a structured, end-to-end approach that fully integrates commissioning with engineering and project management from the outset.

Cleanrooms

    • CQV manager placement

    • HVAC balancing packages

    • Integrity testing of HEPA filters

    • Space classification & particle counting

    • Light & sound testing

    • Pressure cascade set-up and documentation

    • Temperature & relative humidity mapping

    • Microbiological testing

    • Calibration of CAVs / temperature / and relative humidity gauges

    • Team certified to CTCB-I standard

    • CQV management to ISO 14644

    • Preparation of the Room Book

    • Installation qualification & documentation

    • Operation qualification and documentation

    • Performance qualification

    • Certified equipment

    • Start to finish ownership for the mechanical testing on-site

    • Review design ensure flush ability review has been carried out according to BG29 or VIDI 6044/2035

    • Obtain, manage, and organise pre-start checklist from suppliers for Vendor start-ups and SATs.

    • Manage water fill for hydraulic testing – VDI 2035 / 6044 standard (ph, oxygen, conductivity, hardness) and documentation

    • Own sampling and analysis plan.

    • Manage and document any replenishment

    • Author flushing procedure according to VDI 6044 / 2035 system fill and dynamic flush to BSRI

    • Support Flushing – sizing & procurement of temporary pump rig

    • Filtration documentation for client witnessing & Signoff (Mag filtration, Filter filtration, Strainers & Fine filtration)

    • Coordinate works with building automation contractor

    • FAT Testing where required

    • Heat Load deployment for Chiller Load testing & IST support (If applicable)

    • Commissioning Schedule production, management & coordination – inputting into the larger schedule

    • Single Phase Floor Standing Heaters – 3KW – For Low Delta T’s

    • 9KW 15KW, & 22KW  - 3-PhaseFloor standing heaters– Plugged into Temporary PDU or Client’s Power Supply

    • Temporary Racks for Data Centres – Heat Emulators to Match RACK & IT level

    • Single phase: 2kw & 3kw floor standing heaters for smaller data centres, building without racks and IT areas

    • 3 phase: floor standing heaters: 9kw, 15kw and 22kw direct plug-ins for electrical load testing and basic environmental tests when infrastructure not finalised

    • Stackable floor standing emulators: 10kw stackable and 20kw towers to simulate 800mm IT racks

    • Temporary racks: recreate final layouts with with rack-mounted heat load and server emulators installed.

    • Hydraulic flushing rig hires

    • Water / Glycol fluid options

    • BSRIA BG29 Method

    • Flow rates up to 350 L/S – for chilled water mains flushing on data centres.

    • Integrated dosing pots

    • Dual filtration for magnetic and non magnetic impurities down to 1µ

    • High gloss filter housing

    • Pump run dry prevention integrated safety

    • PLC controls for automation control panel

    • Booster options available for larger pipework up to 300mm

    • Custom ordering

    • IVDI 2035-1 and 2 Austrian Standard H5195-5

    • Service includes cooling & heating water treatment up to 10M3

    • Max 560 µs

    • 1µ fine filtration

    • Filter set removal and fine filtration

    • Magnetic particle removals

    • Waste disposal

    • Connection Implementation

    • Documentation

    • System fill attendance if required

    • On site conductivity & PH testing

    • Internet-connected sensors collect real-time environmental testing data

    • Live on-site or remotely accessed information

    • Early issue identification and resolution expediate commissioning

    • Cloud based data storage for easier reporting and commissioning

    • Improved environmental performance

    • Reduced risk and lower expenditure

    • CQV management to ISO 14644

    • Preparation of the Room Book

    • Installation qualification & documentation

    • Operation qualification and documentation

    • Performance qualification

    • Certified equipment

Data Centres