Pharma & Life Sciences
We develop models that align with the way your project is delivered. Take-off data is organised by construction zone, commissioning sequences are embedded before trades arrive on site, and prefabrication packages are designed with logistics, lifting, and installation already considered.
Every drawing is reviewed by our in-house engineering team prior to issue, ensuring all coordination outputs are technically accurate, practically buildable, and genuinely useful to your site team.
-
Compliance to GMP regulations, prioritising drawing sequencing according to construction schedule, technical correctness according to local fire regulations, standards, early commission ability review – we get it.
Ductwork distribution systems – general arrangement
Ductwork & AHU plantrooms
VDI 6022 compliant access hatches coordination – (for clients in Switzerland & Germany)
Roof hood interface coordination
Façade louver – fresh air intake coordination & detailing
Damper compliance review – against CSA openings
Cleanroom Pressure hierarchy drawings
Commissionability review – balancing and pressure cascade
Pressure hierarchy drawings
Generation and distribution – airflow & instrumentation diagrams
-
Reliable Data for Fabrication & Installation
System and fluid-driven reliable design taking into account PED and GMP regulations. Work according to the designer fluid list and system design; however, sequence driven by the construction schedule.
Data structured considering the following: Material management, fabrication & spool management, test pack management, PED stress calculations, pipe classes and pressure rating, construction area according to project schedule, quality handover documents.
Our team has experience of working on Life Science process piping projects of up to 31,000 metres of process pipework.
Process Drainage layouts
Clean utilities layouts & isometrics
CIP & SIP systems
Process Gas distribution systems
Steam & condensate pipework systems
Black Utilities layouts & isometrics
Stress Analysis for PED CAT I, II, & III pipework
Flanged & fully welded pipework
Equipment hook-ups
Spooling & Weld Map creation
Lines, Isometrics, Spooling- data structuring according to construction sequence
-
Reliable data for Fabrication & Installation
The level of interfacing is heightened for coordination within the life sciences sector due to the complex process infrastructure. We understand this makes construction sequencing more complicated due to the need for both an area build and system completion approach.
Our services:
Switch room coordination & layouts
Containment – ELV / LV distribution routes
Fire Alarm
Cleanroom interfaces – (architectural interfacing)
Instrumentation interfaces and secondary containment
Small power and lighting
Mechanical equipment & instrumentation
Access control
Building automation panels