Life Sciences & Process Facilities
-
Compliance to GMP regulations, prioritising drawing sequencing according to construction schedule, technical correctness according to local fire regulations, standards, early commission ability review – we get it.
Ductwork distribution systems – general arrangement
Ductwork & AHU plantrooms
VDI 6022 compliant access hatches coordination – (for clients in Switzerland & Germany)
Roof hood interface coordination
Façade louver – fresh air intake coordination & detailing
Damper compliance review – against CSA openings
Cleanroom Pressure hierarchy drawings
Commissionability review – balancing and pressure cascade
Pressure hierarchy drawings
Generation and distribution – airflow & instrumentation diagrams
-
Reliable Data for Fabrication & Installation
Work according to the designer fluid list and system design; however, sequence driven by the construction schedule.
Data structured considering the following: Material management, fabrication & spool management, test pack management, PED stress calculations, pipe classes and pressure rating, construction area according to project schedule, quality handover documents.
Process Drainage layouts
Clean utilities layouts & isometrics
CIP
systems
Process Gas distribution systems
Steam & condensate pipework systems
Black Utilities layouts & isometrics
Stress Analysis for PED CAT I, II, & III pipework
Flanged & fully welded pipework
Equipment hook-ups
Spooling & Weld Map creation
Lines, Isometrics, Spooling- data structuring according to construction sequence
-
Our services:
Switch room coordination & layouts
Containment – ELV / LV distribution routes
Fire Alarm
Cleanroom interfaces – (architectural interfacing)
Instrumentation interfaces and secondary containment
Small power and lighting
Mechanical equipment & instrumentation
Access control
Building automation panels
We support contractors working in on Life Sciences & Process facilities for HVAC, Process Piping and Supports drawings according to LOD 400 detail

