Pharma & Life Sciences

We develop models that align with the way your project is delivered. Take-off data is organised by construction zone, commissioning sequences are embedded before trades arrive on site, and prefabrication packages are designed with logistics, lifting, and installation already considered.

Every drawing is reviewed by our in-house engineering team prior to issue, ensuring all coordination outputs are technically accurate, practically buildable, and genuinely useful to your site team.

  • Compliance to GMP regulations, prioritising drawing sequencing according to construction schedule, technical correctness according to local fire regulations, standards, early commission ability review – we get it.

    • Ductwork distribution systems – general arrangement

    • Ductwork & AHU plantrooms

    • VDI 6022 compliant access hatches coordination – (for clients in Switzerland & Germany)

    • Roof hood interface coordination

    • Façade louver – fresh air intake coordination & detailing

    • Damper compliance review – against CSA openings

    • Cleanroom Pressure hierarchy drawings

    • Commissionability review – balancing and pressure cascade

    • Pressure hierarchy drawings

    • Generation and distribution – airflow & instrumentation diagrams

  • Reliable Data for Fabrication & Installation

    System and fluid-driven reliable design taking into account PED and GMP regulations. Work according to the designer fluid list and system design; however, sequence driven by the construction schedule.

    Data structured considering the following: Material management, fabrication & spool management, test pack management, PED stress calculations, pipe classes and pressure rating, construction area according to project schedule, quality handover documents.

    Our team has experience of working on Life Science process piping projects of up to 31,000 metres of process pipework.

    • Process Drainage layouts

    • Clean utilities layouts & isometrics

    • CIP & SIP systems

    • Process Gas distribution systems

    • Steam & condensate pipework systems

    • Black Utilities layouts & isometrics

    • Stress Analysis for PED CAT I, II, & III pipework

    • Flanged & fully welded pipework

    • Equipment hook-ups

    • Spooling & Weld Map creation

    • Lines, Isometrics, Spooling- data structuring according to construction sequence

  • Reliable data for Fabrication & Installation

    The level of interfacing is heightened for coordination within the life sciences sector due to the complex process infrastructure. We understand this makes construction sequencing more complicated due to the need for both an area build and system completion approach.

    Our services:

    • Switch room coordination & layouts

    • Containment – ELV / LV distribution routes

    • Fire Alarm

    • Cleanroom interfaces – (architectural interfacing)

    • Instrumentation interfaces and secondary containment

    • Small power and lighting

    • Mechanical equipment & instrumentation

    • Access control

    • Building automation panels