Data Centres

Reduce risk and accelerate delivery

Delivering a successful data centre project demands precision, coordination, and efficiency from concept through to commissioning. Our BIM-led approach integrates design, engineering, and construction expertise to optimise every stage of the build—reducing risk, improving performance, and accelerating delivery.

By combining advanced modelling with practical construction insight, we enable smarter decision-making, streamlined prefabrication, and enhanced coordination across mechanical, electrical, and CSA disciplines. The result is a more efficient, cost-effective, and buildable solution tailored to the complex demands of hyperscale and mission-critical environments.

  • Our in-house expertise regularly design, construct, commission complex MEP modules from inception to completion. We understand the process to develop a design into fabrication & also the challenges & opportunities for successful construction.

    • Feasibility studies

    • Skid build vs onsite build hours-based comparison

    • Standardised modules - one drawing used for several instances

    • CRAC / AHU hook ups

    • Chilled Water pump skids

    • Electrical containment

    • Module map

    • Hyperscale data centre construction

    • Logistic planning - Swept Path analysis

    • Lifting coordination

  • Mechanical design plays a critical role in overall efficiency. We understand how coordinated systems impact PUE and take a holistic approach to optimisation. By incorporating the client’s data hall CFD analysis and specific PUE targets, we provide informed recommendations during design reviews—helping to reduce system resistance and improve performance.

    • AHU Plantrooms

    • Data Hall layouts

    • Distribution - HVAC & piping

    • Tagging inline components

    • Sprinkler coordination

    • LTHW and CHW plantrooms

    • Equipment Layouts

    • Early engineering RFI generations list

    • Swept bends and turning veins to reduce system

    • PIDs vs BIM model comparison per system

    • Clash resistance

  • Power On – a key milestone for any data centre project. We work with project team to identify key areas and containment routes for the commissioning sequence according to cable schedules to assist in project deliverable planning.

    • MV and LV distribution

    • LV switch rooms

    • ELV containment

    • Secondary containment

    • BUSBAR systems

    • Fire alarm systems

    • Voltage drop checks - distance minimisation

    • Small power and lighting

    • BMS / Building Automation Panel design

    • Earthing grid design

    • Topography and single line diagrams

    • UPS and battery storage layouts

    • Access control

  • Need some intro copy here

    • Hot aisle and cold aisle containment

    • Reflected ceiling plans

    • Fire strategy drawings

    • General arrangement drawings - Fixed furnishings and equipment